Roosevelt High School - ROTC Building & New Central Plant

  • Owner: North East ISD
  • Client: Garza Bomberger & Associates
  • Area: 31,000 Sq Ft
  • Construction Cost: $6,000,000
  • MEP Cost: $2,800,000
  • Date Completed: 5/1/2006

Single story addition of ROTC offices, locker rooms, rifle range, classrooms, and ancillary spaces. 1500 ton central plant with three 500 ton centrifugal chillers, three cell stainless steel cooling tower, two fire tube gas fired heating water boilers, associated pumps and controls, fire tube domestic water heater, and water softener. Part of multiple phase reconstruction of the campus. Special coordination issues involving the Mechanical, Electrical and Plumbing systems are required due to continuous use of the campus during this project, with portions of the existing buildings needing to be demolished to make way for the new, while maintaining multiple utility services that criss-crossed the existing campus to keep the remaining buildings functional during construction.

Contact Us

Physical

Email

Austin Office Map

Telephone: (512) 306-9650
FAX:           (512) 306-9655
1120 S Capital of Texas Hwy
Building 1, Suite 150
Austin, TX 78746
San Antonio Office Map

Telephone: (210) 349-1400
FAX:           (210) 349-1465
9830 Colonnade Blvd
Suite 230
San Antonio, TX 78230-2211
Questions:
Contact Us