Vista Ridge High School

Vista Ridge High School

  • Owner: Leander ISD
  • Client: Tew Associates/Architects
  • Area: 400,000 Sq Ft
  • Construction Cost: $55,000,000
  • MEP Cost: $13,750,000
  • Date Completed: 2/10/2004

New high school featuring a combination earth-coupled water source heat pump and rooftop DX units. Outside air was pretreated using enthalpy heat wheels with supplemental DX cooling. All classrooms were supplied with minimum 15 cfm of outside air per student to comply with then current ASHRAE recommendations for indoor air quality. Plumbing systems included electronic sensors for water closets, urinals and lavatories to conserve water and ensure sanitation. Electrical systems included classroom and athletic field lighting (football, baseball, softball and tennis), power distribution, cable tray systems for all data and communication systems and fire alarm systems. Special systems included dust collection system, welding exhaust system, shop compressed air system, laboratory fume hood exhaust systems, and laboratory compressed air system.

Contact Us

Physical

Email

Austin Office Map

Telephone: (512) 306-9650
FAX:           (512) 306-9655
1120 S Capital of Texas Hwy
Building 1, Suite 150
Austin, TX 78746
San Antonio Office Map

Telephone: (210) 349-1400
FAX:           (210) 349-1465
9830 Colonnade Blvd
Suite 230
San Antonio, TX 78230-2211
Questions:
Contact Us